🔧Today's repair job on this VLT6102 75kW went very well, while our ambulance Inverter takes shift cover onsite.
Faulty Power Board swapped out for a refurbished PCB and the failed main cooling fan was swapped out for a brand new replacement. The Inverter was safely powered up using one of our 3-phase variacs (we don't like bangs!) and will now be soaked tested on one of our TASC Dynamic Load Testing rigs for 3 days.